Based on the extensive technical experience of this Professional Counselor, the engineer Marcus Vinicius Parpinelli, and of one professional team with multidisciplinary training, great experience in business and projects of high complexity, we have capacity to propose solutions for the resolution of problems for any company and in the most diverse activities, as the opportunities of the strategic sectors of Brazil, infrastructure, heavy construction, renewable energy, oil and gas, etc.
May 4, 2012
In the shadow of Brazilian Sun, the competition has already begun ...
RIO ALTO ENERGIA has a project ready and licensed of 50 MW of "Concentrated Solar Power", supplemented by Biomass generation, located in Coremas in the state of Paraiba, waiting for the first Solar Auction of the Brazilian Government in 2013.
This project was developed with a mix concept of generation, ie, produce Solar energy during the day and of Biomass during the night, and with a capacity factor greater than photovoltaics.
With this concept of generation, RIO ALTO intends to sell energy in the Government Auction for a price of approximately R$ 180 / MWh (US $ 95 / MWh), ie, well below the R$ 300 / MWh (US $ 158 / MWh) estimated for solar photovoltaics.
The total investment of this project will be for approximately R$ 400 million (US $ 210 million) and the earthworks of the land have already begun.
Congratulations to RIO ALTO, for this initiative ...
Marcus Parpinelli
April 24, 2012
Microgeneration - The Sun began to shine in Brazil ...
Approved by ANEEL, last week, the Normative Resolution 482 of the Microgeneration of Renewable Energy (<1 MW) will boost mainly the development of the market for photovoltaic solar energy in Brazil, while the Brazilian government doesn't perform auctions of this energy source (planned for 2013) which will enable implementation of larger generation projects (>1 MW).
- ANEEL Link, Normative Resolution 482 (in portuguese): http://www.aneel.gov.br/cedoc/ren2012482.pdf
Marcus Parpinelli
April 12, 2012
The Oil and Gás Opportunities in Brazil
The
demand for new businesses and services specializing in the Sector of Oil and
Gas in Brazil is enormous and the Brazilian and foreign companies that are
already installed and working here aren't able to carry out such a volume of
services.
Both
Petrobras and its main suppliers and partners, as ONIP (National Organization
of the Petroleum Industry, the association that aggregates the interests of
others major operators of this sector in Brazil) are demanding new and large
businesses and service contracts with recurrence, mainly due to development of
prospecting and exploration of the pre-salt.
Thus,
we are seeking new alternatives of companies specializing in Oil and Gas, in
North America, Europe and Asia, to provide services to Petrobras and its
suppliers, and also for companies associated with ONIP.
- For more information: reds@globo.com
Marcus Parpinelli
March 29, 2012
Is it real ? The excess energy of Brazilian distributors
The Brazilian government has postponed upcoming auctions A-3 and A-5 based on information that the distributors are with excess energy (?) ...
In my opinion, the government took this decision based on a very short-term scenario , for the sector.
Let's see ... Who is of this sector knows that there are many projects that will not start operation and production within the contracted period ... The excess energy informed by the distributors are a misguided result of a portfolio of projects that only should go into operation in the coming years ... But that, in significant part, will not start production ... ANEEL knows how many power plants (termal, wind, hydro and others) are lagging behind in their schedules or will not be able to start operation for other reasons ... Finally, this excess energy informed (?) Can turn into a défcit quickly ...
Brazil, to maintain their sustainable growth, needs at least 4 GW per year, within the current market conditions, and if the Brazilian industrial sector grow again, as expected, the annual demand of 4 GW is totally insufficient.
Marcus Parpinelli
reds@globo.com
March 16, 2012
1st Solar Auction in Brazil, will hire up to 400 MW ...
The EPE (Energy Research Company of the Brazilian Government) in their study of generating solar photovoltaic, delivered to the MME (Ministry of Mines and Energy), suggested holding an auction to hire up to 400 MW, with a price ceiling of R$ 260 per MWh (approximately USD 145 per MWh). This value has received approval from Brazilian and foreign companies of the solar industry, since it combined with a tax exemption or other form of subsidy to be offered by the Brazilian Government, through the CDE (Energy Development Account).
The moment is of development of photovoltaic solar projects ... Who doesn't to start develop will lose this great opportunity.
The moment is of development of photovoltaic solar projects ... Who doesn't to start develop will lose this great opportunity.
- For more information: reds@globo.com
Marcus Parpinelli
March 13, 2012
The Brazilian Competitive Free Market in Energy
A new trader of energy, BBCE, went into operation and has held its first negotiations on the free market of electricity.
The BBCE will compete with the BRIX (other great trader of energy) in the purchase and sale of electricity, between trading agents and consumers, and it estimates negotiate 1500 MW an average per month in their first semester of operation.
The BBCE will compete with the BRIX (other great trader of energy) in the purchase and sale of electricity, between trading agents and consumers, and it estimates negotiate 1500 MW an average per month in their first semester of operation.
Marcus Parpinelli
February 28, 2012
In Brazil, the sun is getting hotter ...
With the prospects for regulatory confirmed, and the possibility to occur the first auction specific solar energy in 2012, and with government subsidies, the energy market is getting very agitated.
As a result, new projects are beginning to be developed, and large international companies are already making alliances in this sector. The most publicized example is the alliance between GE and MPX (a company of Brazilian billionaire, Eike Batista), to expand your solar farm (the first solar farm constructed and in operation in Brazil), located in the state of Ceara.
As a result, new projects are beginning to be developed, and large international companies are already making alliances in this sector. The most publicized example is the alliance between GE and MPX (a company of Brazilian billionaire, Eike Batista), to expand your solar farm (the first solar farm constructed and in operation in Brazil), located in the state of Ceara.
Marcus Parpinelli
February 16, 2012
Energy in Brazil - March auction will feature 598 new projects
On March 22, 2012, the auction "A-3" will be held for Brazilian government to the dispute of power purchase agreements (PPA), long-term.
598 new projects for power generation were accredited for this auction, of which 524 are wind projects. The government agency (ANEEL) established tariff ceilings for this auction, for R$ 112 / MWh for wind farms and R$ 82 / MWh for the expansion of hydroelectric plants.
Note: The entrepreneurs of this sector considered very low the values of these tariff ceilings, and believe that few projects will be credentialed , as has occurred in the last auction of generation.
598 new projects for power generation were accredited for this auction, of which 524 are wind projects. The government agency (ANEEL) established tariff ceilings for this auction, for R$ 112 / MWh for wind farms and R$ 82 / MWh for the expansion of hydroelectric plants.
Note: The entrepreneurs of this sector considered very low the values of these tariff ceilings, and believe that few projects will be credentialed , as has occurred in the last auction of generation.
Marcus Parpinelli
February 6, 2012
In BRAZIL, the SUN is heating up ...
The Energy Research Company (EPE), planning agency of the Ministry of Mines and Energy of Brazil (MME), is finalizing the study on photovoltaic solar energy. This study will present proposals to boost the development of this source in the country, both in the area of distributed generation, with small panes in homes and industries, as in larger plants.
This study will also present simulations of the government incentives that may be given to this source so that it can gain competitiveness and participate in energy auctions.
In addition, the solar microgeneration is under study by the National Agency of Electrical Energy (ANEEL), and proposes an exchange between customer and distributor, ie, the energy produced by solar panels would be measured and valued, and deducted from the invoice charged to the consumer.
Marcus Parpinelli
January 24, 2012
Creative Startups and Innovative Projects
We are analyzing and selecting creative startups and innovative projects for great investors.
- Send us a information summary / reds@globo.com
Marcus Parpinelli
January 16, 2012
Wasting Opportunities ...
We have been approached by many foreign companies interested in the great potential of the solar market in Brazil. However, all just want to sell solar panels and other products of its manufacture.
To these companies, we've always said that we need of companies interested in come to Brazil to participate in the development of the solar sector and take advantage of the first opportunities that are emerging. Then these companies could to begin to gain a position in this specific market.
The opportunities have appeared. See the cases of the Maracana stadium, Eletrosul buildings and others. So who want to sell solar panels in Brazil, only, is wasting a precious time.
Marcus Parpinelli
January 5, 2012
Many Concession Contracts in Brazil in 2012
The Federal and States Governments have plans to hire in 2012, many Concessions in the Infrastructure Sector, which will involve investments of over US$ 60 billion over these contracts.
Are already scheduled auctions of Concessions Highways, Airports, Power Transmission, Ports, High Speed Train, Conventional Trains, Subways, Treatment of MSW, and others.
- For more information: reds@globo.com
Marcus Parpinelli
December 28, 2011
International Group is looking to buy PCHs in Brazil
International Group is interested in acquiring Brazilian PCHs in operation, with a power output exceeding 10 MW. They study also the purchase of hydroelectric units in preparation (LI), under development or in inventory.
- For more information: reds@globo.com
Marcus Parpinelli
December 23, 2011
To all who patronize this Blog
We wish you and your family a Merry Christmas and a New Year of peace and much success.
Marcus Parpinelli
REDS
December 14, 2011
Great Opportunity - Wind Farms in Northeast Brazil for Sale (100%)
Two wind farms with total power of 151.9 MW. Both wind farms with PPA (Rates PROINFA).
- Wind farm (1) with a 51.2 MW, in operation since 2010, with a capacity factor of 34%, and 152500 MWh contracted.
- Wind farm (2) with 100.7 MW in final stage of construction and assembly, to start operation in the first half of 2012, with a capacity factor of 30%, and 267300 MWh contracted.
Based on these preliminary data, the client interested in buying these wind farms shall formalize a LOI / NDA to have acess to all informations and documentations of these wind farms.
- For more informations: reds@globo.com
Marcus Parpinelli
December 6, 2011
Electric Cars in Brazil, not yet ...
International groups are keen to bring to Brazil, in large-scale, electric cars.
Recently, in the REDS, we receive these investors to discuss on the viability of that business in Brazil and its consequences. We all know that replacing the current cars by electric models is one possible solution for the reductions of emissions of pollutant gases, and of the greenhouse effect caused by this pollution.
However, before any entrepreneurial initiative of this kind, we have to project the impact of this change (the increased demand for electric energy) in the current power generating capacity in Brazil.
Just as an example, the impact of this change of energy source (replace vehicles powered by gasoline, diesel and ethanol by electric models) if implemented only in the state of São Paulo, will require building a new hydroelectric with power equal of the Itaipu.
So it's not moment yet ...
Marcus Parpinelli
November 23, 2011
Solar Energy in Brazil, already in 2012
EPE (Energy Research Company, linked to the Brazilian government) is making a proposal for how would the introduction of solar energy in the country. The expectation is that this proposal will be ready by the end of 2011, to be forwarded to the Ministry of Mines and Energy.
Everything indicates that the model that will be approved in Brazil, will be to decentralized generation, or distributed generation which is the gateway to the source in the energy matrix.
This generation model is the most competitive, with the value of the electricity tariff paid by the consumer. Since, at this juncture, centralized generation is not feasible for solar energy, compared with other sources.
- For more information: reds@globo.com
Marcus Parpinelli
November 16, 2011
Ukrainian Technology to Brazil
Group of Ukraine, owner of new technology of wind turbines, already installed and tested extensively, and with better performance and greater energy production proven, seeks partnership in Brazil, for the development of wind farms with their technology.
- For more information: reds@globo.com
Marcus Parpinelli
November 8, 2011
New Opportunities in Sector of Energy
1. French Group associated with major South Korean conglomerate want to invest in Brazil and other South American countries, in projects of wind parks, solar farms and plants waste treatment with energy generation. They provide full funding of the technology, but with condition of supply of the necessary equipments and PPA signed.
2. American company associated with the state-owned Chinese want to invest (equity) or finance large solar projects in Brazil, preferably. They also are willing to consider projects in others South American countries.
Marcus Parpinelli
For more information: reds@globo.com
November 1, 2011
REDS Opportunities
We represent international financial group, in South America , for granting loans, under special conditions, to finance large projects, especially in strategic sectors of infrastructure, heavy construction, shipbuilding, oil and gas, electric energy, and other. So we seek business opportunities and projects that require large funding, of US$ 1 billion to $ 35 billion.
We represent Brazilian group, of the energy sector, interested in selling two small hydro (2.5 MW and 14 MW), both in operation, and with financial returns in excess of 10% per year. Base price: equivalent to US$ 5.7 million / MW installed.
We represent Brazilian company, of the energy sector, interested in a strategic partner for the construction and operation of two TPP (thermal power plant, at gas) of 500 MW designed in modular system, with planned expansion to up to 1500 MW each. Both projects with expected return of 16% per year, and investment equivalent to US$ 1.2 million / MW installed.
We represent other Brazilian companies of technology, interested in developing cost-effective energy efficiency projects (LED and Smart Grid), sewage treatment, solid waste and recyclables.
Marcus Parpinelli
For more information: reds@globo.com
Marcus Parpinelli
For more information: reds@globo.com
Subscribe to:
Posts (Atom)