Two wind farms with total power of 151.9 MW. Both wind farms with PPA (Rates PROINFA).
- Wind farm (1) with a 51.2 MW, in operation since 2010, with a capacity factor of 34%, and 152500 MWh contracted.
- Wind farm (2) with 100.7 MW in final stage of construction and assembly, to start operation in the first half of 2012, with a capacity factor of 30%, and 267300 MWh contracted.
Based on these preliminary data, the client interested in buying these wind farms shall formalize a LOI / NDA to have acess to all informations and documentations of these wind farms.
- For more informations: reds@globo.com
Marcus Parpinelli